This comprehensive renovation project converts research laboratories into new classrooms, meeting rooms, academic offices, and collaboration spaces within Kline Tower (KT), while also enhancing connectivity with the surrounding buildings.
Bold but thoughtful changes, such as a new grand staircase that now connects the lower three floors of the tower, were made to the original Philip Johnson-designed structure to bring people together across the building. Another signature feature of this project includes a re-envisioned fourteenth floor, which once housed mechanical systems, and what is now one of the university’s most coveted event spaces. New conference areas on this floor provide panoramic views of Yale, greater New Haven, and the Long Island Sound.
location
project size
186,000 gross square feet
Construction schedule
Fall 2020 to August 2023 (tower), summer 2024 (concourse)
Impact on the area
Building and its surrounding area are fully operable.
for THE COMMUNITY
Grounds surrounding the building received new plantings and grow-in continues.
building details
- Architect, 1966: Philip C. Johnson, DFAH 1978
- Renovation, 2023: Stantec (designer); Gilbane Building Company (contractor)
- Style: Late Modernism, New Formalism
sustainability
The Kline Tower renovation is targeting a LEED Gold v4 certification. For more information about Yale’s built environment, visit the Office of Sustainability.